Proposal generation
Confirm the build in five steps
Industry → intent → scale → reliability → budget. One decision per step — then a presentable, exportable ICT draft.
Selected
Nothing selected yet · choose below and the summary updates here
This step locks the dedicated pack pool — then confirm build intent (~3 min total)
Which industry is this project in?
What this step decides行业不同,设备角色与合规侧重点不同——先锁定匹配池,再谈型号。
✦专家团按行业锁定匹配池——医院会优先核验高可用与等保组件,园区则关注密度与分层。